PPG China Relocate MTR’s Rail Grinder Machine

Wangfoong Global Logistics successfully arranged night transportation of an over-weight and over-size rail grinder machine. The operation was completed with convoy operation using hydraulic trailer equipped with adjustable steering system. MTR’s depot has an unloading area with limited headroom and space that necessitated special tandem lifting. Two units of lorry cranes were utilised to perform tandem lifting at the MTR depot, and necessary road permits were secured for over-weight and over-size transportation and tailor-made spreader beam for lifting. Wangfoong also prepared documents with their method statement with detailed calculations and drawings.

 

PPG membership is available in selective countries. Please contact us for more information at: kevinstephens@ppgprojects.com